PROJECT
Local building contractor, Kirk Contracts were completing works on behalf of Newry Mourne & Down District Council at Strangford Road Council Depot. They were developing the entrance to the site, as well as upgrading an existing car park. Breezemount Perimeter Security team were awarded the contract by Kirk Contracts to supply and install an automatic gate and traffic barriers.
SOLUTION
A busy entrance we needed to offer a solution that would control access and improve security to the council depot. Our Perimeter Security team supplied and installed a 8m x 2.4m Automatic SG2 Cantilever Sliding Gate with an integrated pedestrian gate from leading gate manufacturers, Heras. The Pedestrian gate was complete with electric lock and self-closer. The sliding gate has a free exit loop. The access controls for both the gate and pedestrian gate were installed by the council’s access control provider.
In the car park we supplied and installed 2no. FAAC B614 Traffic Barriers. One for entry and one for exit. The entry barrier was controlled by the council’s access control system, and the exit barrier has a free exit loop. Both traffic barriers have HGV safety induction loops and LED boom lighting.
RESULT
Seamlessly integrated into the council’s pre-existing access control system, the Heras SG2 Sliding Gate and FAAC traffic barriers are highly suited for industrial and commercial sites, providing long term reliability and security.